Monday, November 16, 2009

So much to do!!

Grad school is busy. Oiy.

In the next two weeks, I must accomplish a lot of stuff.
- Hydrogeology Problem Set (or two)
- Hydrogeology Take-Home test (almost done!)
- Cut a bunch of basalts down to size
- Schedule SEM time to look at the olivines in said basalts
- Give a short presentation regarding my research to my adviser and her other students
- Have my GSA Grant Proposal draft finished
- Give a practice Thesis Proposal talk to my class
- Finish the Thesis Proposal draft
- Prepping the last two labs of the semester
- Grading policy letters for those labs
- and any 'normal' homework that pops up in there (and it will)

I may need to use a substantial amount of caffeine to do this. It might hurt. Oiy.

2 comments:

  1. See! You always start wit you list, and before you now it, poof, you're done! You rock, Julie. No pun intended!

    ReplyDelete
  2. Thanks! I'm about half-way done with that list right now, but unfortunately a lot of the stuff that's left is time consuming. But, a lot of that stuff builds off of each other, so hopefully it won't be too tough to get through.

    ReplyDelete